This project will replace the Vineyard Road Bridge at Laguna Creek in the Vineyard Community of South Sacramento County to provide a number of roadway and creek system benefits:
- Raising the bridge and roadway profile to clear the 100-year flood event.
- Adding dedicated shoulders and sidewalks for bicyclists, pedestrians, and equestrians.
- Increasing accessibility for persons with disabilities.
This project includes:
- Replacing the existing bridge structure with a wider structure to accommodate a future 4-lane arterial roadway section with a raised median.
- Shoulders and sidewalks on both sides to maintain continuity with the pedestrian/equestrian trails and equestrian staging area off of Clover Ranch Drive.
- Maintain a signalized mid-block pedestrian/equestrian crossing south of the bridge.
- Equestrian safety fencing on one side of the bridge.
- Street Lighting, Drainage and Landscape Improvements.
Preliminary Design, 2008 to 2009
Environmental Review, 2009 to 2010 (As of May 2010, delayed pending
approval of Transportation Element of General Plan Update)
-DERA Control No. 2009-70016
-Public Review/Comment, ?
-Environmental Hearing at Board, ?
Community Meetings, April 2009, February 2010, May 2010 Final Design, 2010 Right-of-Way Acquisition, 2010 to 2011 Construction, 2012
Board of Supervisors Adoption Hearings for General Plan Update - Transportation Element August 2010 (To Be Determined)
May 6, 2010 (7:00 PM to 9:00 PM) Arnold Adreani Elementary School Multi-Purpose Room 9927 Wildhawk West Drive Sacramento, CA 95829
Community Meeting Letter
Estimated Total Cost of this project is $8.7 million with funding provided by the Federal Highway Bridge Program and the Vineyard Public Financing Districts Fee Program.
Anthony Voo, P.E. Project Manager 916-874-7871